{"sample":true,"period_start":"2024-02-26","period_end":"2026-09-01","coverage":"unverified_fixtures","source_health_notes":["SAMPLE: fixture records rendered for inspection; not a live reporting window"],"count":9,"undated_count":0,"events":[{"project_id":-1,"event_id":-101,"project_name":"Circle T Data Center Campus","campus":"Circle T Ranch","phase":null,"municipality":"Westlake","county":"Tarrant","address_or_location":"Northeast corner of US Highway 377 and Westport Parkway, Westlake, TX (PD 3-8, Office/Industrial Sub-District); developer's deck gives 13572 N Main Street, Westlake, TX 76262","developer":null,"applicant":null,"owner":null,"provenance":"source_backed","observation_context":"historical_backfill","source_url":"https://www.westlake-tx.org/m/newsflash/Home/Detail/821","source_page_or_section":"News flash 821, paragraphs 2–3","sources":[{"role":"outcome","source_url":"https://www.westlake-tx.org/m/newsflash/Home/Detail/821","source_page_or_section":"News flash 821, paragraphs 2–3","published_at":"2026-08-01","source_key":"response_821"}],"source_published_at":"2026-08-01","meeting_date":null,"first_observed_at":"2026-09-09","stage":"proposal","stage_actor":"Town of Westlake / City of Keller / Hillwood Properties (pre-application meeting)","what_changed":null,"megawatts":null,"capacity_claims":[],"equipment_notes":null,"approvals_notes":"In December 2024 Westlake, Keller and Hillwood leaders met to discuss the proposed development, including a preliminary site plan, location, size, noise, water and electrical infrastructure.","supplier_selection_notes":null,"inferred_buyer_relevance":null,"suggested_verification_next_step":null,"review_state":"sample","unknowns":["meeting date known only to 2024-12 precision (source: News flash 821, paragraphs 2–3)","site-plan application/case number (not in packet text)","IT load / critical capacity in MW (only 300 MW utility capacity and a 350 MW substation are stated)","tenant identity","outcome of the 2026-08-26 Tarrant County hearing, the cause number and the plaintiff","whether the development agreement has since been voted on (nothing after 2026-08-18 found)","P&Z 2026-08-04 minutes (not yet published on CivicClerk at retrieval time)","council vote count on Ordinance 1015 (2025-01-06 minutes are a scanned image; OCR not run)","the applicant for the 2024–25 PD 3-8 text amendment (unnamed in the packet text)","equipment vendors / supplier selection (only Ameristar Palisade fence and Lueders stone, presentation pp.18–22)","Month precision only.","A pre-application meeting, not a filing; the earliest dated event the Town itself cites."],"record_class":"project"},{"project_id":-1,"event_id":-102,"project_name":"Circle T Data Center Campus","campus":"Circle T Ranch","phase":null,"municipality":"Westlake","county":"Tarrant","address_or_location":"Northeast corner of US Highway 377 and Westport Parkway, Westlake, TX (PD 3-8, Office/Industrial Sub-District); developer's deck gives 13572 N Main Street, Westlake, TX 76262","developer":null,"applicant":null,"owner":null,"provenance":"source_backed","observation_context":"historical_backfill","source_url":"https://westlaketx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=62,plainText=false)","source_page_or_section":"p.36 (staff report, P&Z recommendation paragraph); p.81 (ordinance recital)","sources":[{"role":"outcome","source_url":"https://westlaketx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=62,plainText=false)","source_page_or_section":"Town Council 2025-01-06 packet p.36: 'met on December 10, 2024, and, with a vote of (5-1-1, with one absence), recommended approval'","published_at":null,"source_key":"council_packet_2025-01-06_62"},{"role":"corroboration","source_url":"https://westlaketx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=62,plainText=false)","source_page_or_section":"Ordinance 1015 recital p.81","published_at":null,"source_key":"council_packet_2025-01-06_62"}],"source_published_at":null,"meeting_date":"2024-12-10","first_observed_at":"2026-09-09","stage":"proposal","stage_actor":"Westlake Planning & Zoning Commission (recommendation only, 5-1-1 with one absence)","what_changed":null,"megawatts":null,"capacity_claims":[],"equipment_notes":null,"approvals_notes":"P&Z recommended approval of the PD 3-8 text amendments (which add 'Data Center — permitted by right in the Office/Industrial sub-area and by SUP in the Office sub-area', and 'Electrical Substations — permitted by right in the Office and Office/Industrial sub-areas instead of by SUP').","supplier_selection_notes":null,"inferred_buyer_relevance":null,"suggested_verification_next_step":null,"review_state":"sample","unknowns":["site-plan application/case number (not in packet text)","IT load / critical capacity in MW (only 300 MW utility capacity and a 350 MW substation are stated)","tenant identity","outcome of the 2026-08-26 Tarrant County hearing, the cause number and the plaintiff","whether the development agreement has since been voted on (nothing after 2026-08-18 found)","P&Z 2026-08-04 minutes (not yet published on CivicClerk at retrieval time)","council vote count on Ordinance 1015 (2025-01-06 minutes are a scanned image; OCR not run)","the applicant for the 2024–25 PD 3-8 text amendment (unnamed in the packet text)","equipment vendors / supplier selection (only Ameristar Palisade fence and Lueders stone, presentation pp.18–22)","A recommendation, not a decision (regression c). The applicant for the text amendment is referred to only as 'the applicant'/'the developer' in the packet text; not named."],"record_class":"project"},{"project_id":-1,"event_id":-103,"project_name":"Circle T Data Center Campus","campus":"Circle T Ranch","phase":null,"municipality":"Westlake","county":"Tarrant","address_or_location":"Northeast corner of US Highway 377 and Westport Parkway, Westlake, TX (PD 3-8, Office/Industrial Sub-District); developer's deck gives 13572 N Main Street, Westlake, TX 76262","developer":null,"applicant":null,"owner":null,"provenance":"source_backed","observation_context":"historical_backfill","source_url":"https://westlaketx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=5474,plainText=false)","source_page_or_section":"p.40 (Background: adoption of Ordinance 1015 on 2025-01-06); proposal text in council packet fileId 62 pp.32–36, 81–85","sources":[{"role":"packet","source_url":"https://westlaketx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=62,plainText=false)","source_page_or_section":"Staff report pp.32–36 (printed 2025-01-03); Ordinance 1015 text pp.81–85 — what was proposed","published_at":null,"source_key":"council_packet_2025-01-06_62"},{"role":"outcome","source_url":"https://westlaketx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=5474,plainText=false)","source_page_or_section":"P&Z 2026-08-04 packet p.40: 'amended again pursuant to Ordinance No. 1015 on January 6, 2025'","published_at":null,"source_key":"pz_packet_2026-08-04_5474"},{"role":"corroboration","source_url":"https://westlaketx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=5484,plainText=false)","source_page_or_section":"Resolution 26-25 recital p.6: PD 3-8 'as further amended by … Ordinance No. 1015'","published_at":null,"source_key":"council_special_packet_2026-08-17_5484"}],"source_published_at":null,"meeting_date":"2025-01-06","first_observed_at":"2026-09-09","stage":"approved","stage_actor":"Westlake Town Council — Ordinance No. 1015 adopted after public hearing (File # ORD-1015, agenda item F.2)","what_changed":null,"megawatts":null,"capacity_claims":[],"equipment_notes":null,"approvals_notes":"Text amendments to PD 3-8 ('generally located at the southeast corner of U.S. Highway 377 and State Highway 170'; Circle T Ranch, Ordinances 307/314 of 1998-09-14, 322 of 1998-12-14, 438 of 2003-06-09, 592 of 2008-04-24). Staff recommended approval with seven conditions, including the note that after the FIRST data center's site plan in the Office/Industrial Sub-district each successive data center requires an SUP, and that the building-quality-manual façade rules apply only to façades facing US 377 and residential properties for that first data center. Also raises Office/Industrial max height to 80 ft and lot coverage to 70%.","supplier_selection_notes":null,"inferred_buyer_relevance":null,"suggested_verification_next_step":null,"review_state":"sample","unknowns":["site-plan application/case number (not in packet text)","IT load / critical capacity in MW (only 300 MW utility capacity and a 350 MW substation are stated)","tenant identity","outcome of the 2026-08-26 Tarrant County hearing, the cause number and the plaintiff","whether the development agreement has since been voted on (nothing after 2026-08-18 found)","P&Z 2026-08-04 minutes (not yet published on CivicClerk at retrieval time)","council vote count on Ordinance 1015 (2025-01-06 minutes are a scanned image; OCR not run)","the applicant for the 2024–25 PD 3-8 text amendment (unnamed in the packet text)","equipment vendors / supplier selection (only Ameristar Palisade fence and Lueders stone, presentation pp.18–22)","The council vote count is in the 2025-01-06 minutes (fileId 93), which are image-only (0 extractable characters) — not read. Adoption is established by the later staff report and resolution, not by minutes text.","The use approval is a separate track from the 2026 site plan."],"record_class":"project"},{"project_id":-1,"event_id":-104,"project_name":"Circle T Data Center Campus","campus":"Circle T Ranch","phase":null,"municipality":"Westlake","county":"Tarrant","address_or_location":"Northeast corner of US Highway 377 and Westport Parkway, Westlake, TX (PD 3-8, Office/Industrial Sub-District); developer's deck gives 13572 N Main Street, Westlake, TX 76262","developer":"Circle T Owner, LP","applicant":"Kimley-Horn","owner":"Circle T Owner, LP","provenance":"source_backed","observation_context":"historical_backfill","source_url":"https://www.westlake-tx.org/m/newsflash/home/detail/822","source_page_or_section":"News flash 822 (whole); conditions enumerated in paragraph 5","sources":[{"role":"outcome","source_url":"https://www.westlake-tx.org/m/newsflash/home/detail/822","source_page_or_section":"News flash 822 (whole): 'approved the site plan with conditions' + the three conditions","published_at":"2026-08-05","source_key":"pz_recap_822"},{"role":"packet","source_url":"https://westlaketx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=5474,plainText=false)","source_page_or_section":"Item F.1 pp.40–42: staff report, recommends approval as submitted; applicant Kimley-Horn","published_at":null,"source_key":"pz_packet_2026-08-04_5474"},{"role":"corroboration","source_url":"https://www.westlake-tx.org/m/newsflash/Home/Detail/823","source_page_or_section":"News flash 823: 'On Tuesday, August 4th … approved the site plan … with three conditions'","published_at":"2026-08-06","source_key":"truth_823"},{"role":"corroboration","source_url":"https://westlaketx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=5484,plainText=false)","source_page_or_section":"Resolution 26-25 recital p.7: 'met on August 4, 2026 … acted to approve a site plan with conditions'","published_at":null,"source_key":"council_special_packet_2026-08-17_5484"}],"source_published_at":"2026-08-05","meeting_date":"2026-08-04","first_observed_at":"2026-09-09","stage":"approved","stage_actor":"Westlake Planning & Zoning Commission (site plan, with three added conditions)","what_changed":null,"megawatts":null,"capacity_claims":[{"value_mw":300.0,"capacity_type":"campus_utility_capacity","quote":"CAPACITY / UTILITY PROVIDER  300 MW / Oncor","source_url":"https://www.westlake-tx.org/DocumentCenter/View/6805/Data-Center-P-and-Z-Presentation","source_document_id":null,"source_page_or_section":"p.6; also 'PH Circle T [300 MW]' on the portfolio map p.3"},{"value_mw":350.0,"capacity_type":"substation","quote":"A new 350-megawatt substation … Paid for entirely by the developer","source_url":"https://www.westlake-tx.org/DocumentCenter/View/6810/Data-Center-FAQ2","source_document_id":null,"source_page_or_section":"p.3; also the FAQ web page and white paper p.2 ('dropping a 350-megawatt substation near the pump station'); the substation itself needs its own future site plan (P&Z packet p.41)"}],"equipment_notes":null,"approvals_notes":"Site plan for a data center on ~87.96 acres at the NE corner of US 377 and Westport Pkwy, PD 3-8. Staff: substantially complies with the UDC and PD 3-8; recommends approval. P&Z approved with three conditions: 8-ft berm or sound wall on the south line; acoustic barriers/louvers around HVAC, cooling towers and generators; more evergreen/hardwood screening. Four buildings, private substation and backup generators (substation/switchyard excluded from this approval).","supplier_selection_notes":null,"inferred_buyer_relevance":null,"suggested_verification_next_step":null,"review_state":"sample","unknowns":["site-plan application/case number (not in packet text)","IT load / critical capacity in MW (only 300 MW utility capacity and a 350 MW substation are stated)","tenant identity","outcome of the 2026-08-26 Tarrant County hearing, the cause number and the plaintiff","whether the development agreement has since been voted on (nothing after 2026-08-18 found)","P&Z 2026-08-04 minutes (not yet published on CivicClerk at retrieval time)","council vote count on Ordinance 1015 (2025-01-06 minutes are a scanned image; OCR not run)","the applicant for the 2024–25 PD 3-8 text amendment (unnamed in the packet text)","equipment vendors / supplier selection (only Ameristar Palisade fence and Lueders stone, presentation pp.18–22)","The vote itself is known from the Town's recap and the later resolution recital, not from minutes — the P&Z minutes for 2026-08-04 were not in the events returned (no 'Minutes' file on that event yet).","A site-plan approval, not a use decision and not the development agreement."],"record_class":"project"},{"project_id":-1,"event_id":-105,"project_name":"Circle T Data Center Campus","campus":"Circle T Ranch","phase":null,"municipality":"Westlake","county":"Tarrant","address_or_location":"Northeast corner of US Highway 377 and Westport Parkway, Westlake, TX (PD 3-8, Office/Industrial Sub-District); developer's deck gives 13572 N Main Street, Westlake, TX 76262","developer":"Circle T Owner, LP","applicant":null,"owner":"Circle T Owner, LP","provenance":"source_backed","observation_context":"historical_backfill","source_url":"https://www.westlake-tx.org/m/newsflash/Home/Detail/825","source_page_or_section":"News flash 825 (whole)","sources":[{"role":"outcome","source_url":"https://www.westlake-tx.org/m/newsflash/Home/Detail/825","source_page_or_section":"News flash 825 (whole): 'unanimously voted to table … after a Tarrant County judge put a temporary hold'; hearing 2026-08-26 10 am","published_at":"2026-08-18","source_key":"council_recap_825"},{"role":"packet","source_url":"https://westlaketx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=5484,plainText=false)","source_page_or_section":"Item E.1 pp.3–8: Resolution 26-25 and staff report (Town Manager recommends approval); agreement terms","published_at":null,"source_key":"council_special_packet_2026-08-17_5484"},{"role":"corroboration","source_url":"https://www.westlake-tx.org/m/newsflash/Home/Detail/824","source_page_or_section":"News flash 824: special meeting noticed for 2026-08-17 4:00 pm","published_at":"2026-08-10","source_key":"special_meeting_824"}],"source_published_at":"2026-08-18","meeting_date":"2026-08-17","first_observed_at":"2026-09-09","stage":"uncertain","stage_actor":"Westlake Town Council (special meeting) — tabled after a Tarrant County judge's temporary hold","what_changed":null,"megawatts":null,"capacity_claims":[],"equipment_notes":null,"approvals_notes":"Resolution 26-25 would approve a Development Agreement for Subdivision Improvements between the Town and Circle T Owner, LP: one-time contribution up to $914,000 for pump-station piping (due within 30 days of execution); cooling system WUE not to exceed 0.25 L/kWh long-term average; acoustic louvers, berms and sound walls plus a noise-compliance report within 180 days of construction completion; PUCT/ERCOT audit documentation under the Governor's 2026-08-03 directive required before a final certificate of occupancy, failing which the Town Manager may require the buildings be repurposed; no grading until Town Engineer approves grading/drainage plans. Council unanimously TABLED it because a Tarrant County judge placed a temporary hold; a court hearing was set for 10 am 2026-08-26 and a vote was to be scheduled afterwards.","supplier_selection_notes":null,"inferred_buyer_relevance":null,"suggested_verification_next_step":null,"review_state":"sample","unknowns":["site-plan application/case number (not in packet text)","IT load / critical capacity in MW (only 300 MW utility capacity and a 350 MW substation are stated)","tenant identity","outcome of the 2026-08-26 Tarrant County hearing, the cause number and the plaintiff","whether the development agreement has since been voted on (nothing after 2026-08-18 found)","P&Z 2026-08-04 minutes (not yet published on CivicClerk at retrieval time)","council vote count on Ordinance 1015 (2025-01-06 minutes are a scanned image; OCR not run)","the applicant for the 2024–25 PD 3-8 text amendment (unnamed in the packet text)","equipment vendors / supplier selection (only Ameristar Palisade fence and Lueders stone, presentation pp.18–22)","Separate track from seq 4: tabling the agreement does not undo the site-plan approval; conversely no building or grading permit can issue until the agreement is approved (P&Z packet p.41–42).","The August 26 hearing's outcome, cause number and plaintiff are in no preserved document. CivicClerk shows no council event between 2026-08-18 and 2026-09-01 other than the 08-25 Board of Trustees; the 2026-08-18 regular-meeting recap (826) has no data-center item.","Status as of 2026-09-09 is unknown from these sources."],"record_class":"project"},{"project_id":-2,"event_id":-201,"project_name":"Prime Data Centers — 2000 Holford Road (Z 23-47)","campus":null,"phase":null,"municipality":"Garland","county":"Dallas","address_or_location":"2000 Holford Road, Garland, TX (District 7); a 48.93-acre tract, Lot 2, Block 1, Sanctuary Addition (Ordinance Exhibit A)","developer":null,"applicant":null,"owner":null,"provenance":"source_backed","observation_context":"historical_backfill","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=835,plainText=false)","source_page_or_section":"2024-03-11 packet pp.5–7 (2024-02-26 minutes, item 3.a)","sources":[{"role":"outcome","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=835,plainText=false)","source_page_or_section":"pp.5–7: 'Motion carried: 5 Ayes, 3 Nays with Commissioners Cornelius, Aubin and Abell voting in opposition'","published_at":null,"source_key":"pc_packet_2024-03-11_835"},{"role":"packet","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=842,plainText=false)","source_page_or_section":"item 3.a p.2; planning report pp.17–19; PD conditions pp.21–22","published_at":null,"source_key":"pc_packet_2024-02-26_842"}],"source_published_at":null,"meeting_date":"2024-02-26","first_observed_at":"2026-09-10","stage":"proposal","stage_actor":"Garland Plan Commission (recommendation only, 5-3; recommended limiting the PD to the data center and substation)","what_changed":null,"megawatts":null,"capacity_claims":[{"value_mw":48.0,"capacity_type":"unspecified","quote":"DFW02-01 2 STORY 48MW DATA CENTER 710' x 194' FFE: 546.00'","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=842,plainText=false)","source_document_id":null,"source_page_or_section":"Detail Plan sheets pp.24, 25, 27 (one label per building; three buildings)"},{"value_mw":48.0,"capacity_type":"unspecified","quote":"DFW02-02 2 STORY 48MW DATA CENTER 710' x 194' FFE: 546.00'","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=842,plainText=false)","source_document_id":null,"source_page_or_section":"Detail Plan sheets pp.24, 25, 27 (one label per building; three buildings)"},{"value_mw":48.0,"capacity_type":"unspecified","quote":"DFW02-03 2 STORY 48MW DATA CENTER 710' x 194' FFE: 546.00'","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=842,plainText=false)","source_document_id":null,"source_page_or_section":"Detail Plan sheets pp.24, 25, 27 (one label per building; three buildings)"}],"equipment_notes":null,"approvals_notes":"Staff recommended approval (planning report, fileId 842 pp.17–19). Plan Commission public hearing 2024-02-26: motion to approve as presented, with the recommendation that the PD be permitted only for the data center and substation, carried 5–3.","supplier_selection_notes":null,"inferred_buyer_relevance":null,"suggested_verification_next_step":null,"review_state":"sample","unknowns":["IT load / critical capacity: the Detail Plan sheets label each of three buildings '2 STORY 48MW DATA CENTER' (fileId 842 pp.24–27; fileId 285 pp.194–197) without saying what the 48 MW is — recorded as unspecified capacity claims; no IT, critical, utility or substation figure is stated","tenant identity (three tenants are mentioned, none named)","applicant and owner: the agenda titles, ordinance caption and minutes treat 'Prime Data Centers / Munsch Hardt Kopf & Harr' as the requesting party, while the staff report's role labels (fileId 842 p.17) read 'APPLICANT Woodlands of Spring Creek LP' and 'OWNER Prime Data Centers / Munsch Hardt Kopf & Harr'; no source assigns both roles consistently","equipment vendors / supplier selection (none stated)","A recommendation, not a decision (regression c)."],"record_class":"project"},{"project_id":-2,"event_id":-202,"project_name":"Prime Data Centers — 2000 Holford Road (Z 23-47)","campus":null,"phase":null,"municipality":"Garland","county":"Dallas","address_or_location":"2000 Holford Road, Garland, TX (District 7); a 48.93-acre tract, Lot 2, Block 1, Sanctuary Addition (Ordinance Exhibit A)","developer":null,"applicant":null,"owner":null,"provenance":"source_backed","observation_context":"historical_backfill","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=291,plainText=false)","source_page_or_section":"2024-03-19 minutes p.6, item b","sources":[{"role":"outcome","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=291,plainText=false)","source_page_or_section":"p.6: 'Motion carried: 7 ayes and 2 nayes by Council Members Lucht and Dutton'","published_at":null,"source_key":"council_minutes_2024-03-19_291"},{"role":"corroboration","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=285,plainText=false)","source_page_or_section":"p.186 staff report: 'Case Z 23-47 was approved via public hearing during the March 19, 2024 Regular City Council meeting'","published_at":null,"source_key":"council_packet_2024-04-02_285"}],"source_published_at":null,"meeting_date":"2024-03-19","first_observed_at":"2026-09-10","stage":"approved","stage_actor":"Garland City Council — public hearing, 7 ayes / 2 nays (Lucht, Dutton)","what_changed":null,"megawatts":null,"capacity_claims":[],"equipment_notes":null,"approvals_notes":"Public hearing 2024-03-19: motion to approve the change in zoning to a PD based in CO and the Detail Plan for a Data Center and Electric Substations carried 7 ayes, 2 nays; discussion of proximity to the Spring Creek Preserve.","supplier_selection_notes":null,"inferred_buyer_relevance":null,"suggested_verification_next_step":null,"review_state":"sample","unknowns":["IT load / critical capacity: the Detail Plan sheets label each of three buildings '2 STORY 48MW DATA CENTER' (fileId 842 pp.24–27; fileId 285 pp.194–197) without saying what the 48 MW is — recorded as unspecified capacity claims; no IT, critical, utility or substation figure is stated","tenant identity (three tenants are mentioned, none named)","applicant and owner: the agenda titles, ordinance caption and minutes treat 'Prime Data Centers / Munsch Hardt Kopf & Harr' as the requesting party, while the staff report's role labels (fileId 842 p.17) read 'APPLICANT Woodlands of Spring Creek LP' and 'OWNER Prime Data Centers / Munsch Hardt Kopf & Harr'; no source assigns both roles consistently","the 2024-03-19 agenda packet (fileId 290) was not fetched"],"record_class":"project"},{"project_id":-2,"event_id":-203,"project_name":"Prime Data Centers — 2000 Holford Road (Z 23-47)","campus":null,"phase":null,"municipality":"Garland","county":"Dallas","address_or_location":"2000 Holford Road, Garland, TX (District 7); a 48.93-acre tract, Lot 2, Block 1, Sanctuary Addition (Ordinance Exhibit A)","developer":null,"applicant":null,"owner":null,"provenance":"source_backed","observation_context":"historical_backfill","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=1079,plainText=false)","source_page_or_section":"2024-04-02 minutes p.4, item b","sources":[{"role":"outcome","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=1079,plainText=false)","source_page_or_section":"p.4: 'APPROVED Z 23-47 … Ordinance No. 7520'","published_at":null,"source_key":"council_minutes_2024-04-02_1079"},{"role":"packet","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=285,plainText=false)","source_page_or_section":"item 9.b p.3; staff report p.186; ordinance pp.187–189; Exhibit A p.190","published_at":null,"source_key":"council_packet_2024-04-02_285"}],"source_published_at":null,"meeting_date":"2024-04-02","first_observed_at":"2026-09-10","stage":"approved","stage_actor":"Garland City Council — Ordinance No. 7520 adopted (consent item 9.b)","what_changed":null,"megawatts":null,"capacity_claims":[{"value_mw":48.0,"capacity_type":"unspecified","quote":"DFW02-01 2 STORY 48MW DATA CENTER 710' x 194' FFE: 546.00'","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=285,plainText=false)","source_document_id":null,"source_page_or_section":"Detail Plan sheets pp.194, 195, 197 (Exhibits C–E; one label per building; three buildings)"},{"value_mw":48.0,"capacity_type":"unspecified","quote":"DFW02-02 2 STORY 48MW DATA CENTER 710' x 194' FFE: 546.00'","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=285,plainText=false)","source_document_id":null,"source_page_or_section":"Detail Plan sheets pp.194, 195, 197 (Exhibits C–E; one label per building; three buildings)"},{"value_mw":48.0,"capacity_type":"unspecified","quote":"DFW02-03 2 STORY 48MW DATA CENTER 710' x 194' FFE: 546.00'","source_url":"https://garlandtx.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=285,plainText=false)","source_document_id":null,"source_page_or_section":"Detail Plan sheets pp.194, 195, 197 (Exhibits C–E; one label per building; three buildings)"}],"equipment_notes":null,"approvals_notes":"Ordinance No. 7520 adopted 2024-04-02: a Change in Zoning from AG to a PD based in CO and a Detail Plan for a Data Center and Electric Substations on 48.93 acres at 2000 Holford Road; PD conditions (Exhibit B) permit CO uses plus a Data Center Use and an Electric Substation Use, with the landscape and screening plan (8-ft ornamental fence at the data center, 8-ft solid wall at the substation).","supplier_selection_notes":null,"inferred_buyer_relevance":null,"suggested_verification_next_step":null,"review_state":"sample","unknowns":["IT load / critical capacity: the Detail Plan sheets label each of three buildings '2 STORY 48MW DATA CENTER' (fileId 842 pp.24–27; fileId 285 pp.194–197) without saying what the 48 MW is — recorded as unspecified capacity claims; no IT, critical, utility or substation figure is stated","tenant identity (three tenants are mentioned, none named)","applicant and owner: the agenda titles, ordinance caption and minutes treat 'Prime Data Centers / Munsch Hardt Kopf & Harr' as the requesting party, while the staff report's role labels (fileId 842 p.17) read 'APPLICANT Woodlands of Spring Creek LP' and 'OWNER Prime Data Centers / Munsch Hardt Kopf & Harr'; no source assigns both roles consistently","construction, site-plan or later amendments after 2024-04-16 (not checked)"],"record_class":"project"},{"project_id":-3,"event_id":-301,"project_name":"Project Tomahawk — Parvin Road at FM 1385 (ZONE-26-0007)","campus":null,"phase":null,"municipality":"Prosper","county":"Denton","address_or_location":"a portion of Parvin 1385 Addition, Block A, Lot 2, 37.3± acres, 1,590± feet south of Parvin Road and 855± feet east of FM 1385, Prosper, TX; behind the Brazos substation that fronts FM 1385","developer":null,"applicant":null,"owner":"D9-1 Assets, LLC","provenance":"source_backed","observation_context":"historical_backfill","source_url":"https://mccmeetings.blob.core.usgovcloudapi.net/prospertx-pubu/MEET-Packet-74ba703b04e946dc952f6782be3a6bb2.pdf","source_page_or_section":"2026-09-01 P&Z packet pp.45–49 (staff report); agenda p.2 item 4","sources":[{"role":"packet","source_url":"https://mccmeetings.blob.core.usgovcloudapi.net/prospertx-pubu/MEET-Packet-74ba703b04e946dc952f6782be3a6bb2.pdf","source_page_or_section":"pp.45–49: 'Re: Planned Development for Project Tomahawk' … 'Town Staff recommends the Planning and Zoning Commission approve the request'","published_at":null,"source_key":null},{"role":"corroboration","source_url":"https://mccmeetings.blob.core.usgovcloudapi.net/prospertx-pubu/MEET-Agenda-74ba703b04e946dc952f6782be3a6bb2.pdf","source_page_or_section":"p.2 item 4 (ZONE-26-0007)","published_at":null,"source_key":null},{"role":"corroboration","source_url":"https://mccmeetings.blob.core.usgovcloudapi.net/prospertx-pubu/MEET-Agenda-31cdf54f8aaf426b875fa67f524bf692.pdf","source_page_or_section":"Town Council 2026-09-08 agenda p.3 item 19 (hearing scheduled)","published_at":null,"source_key":null}],"source_published_at":null,"meeting_date":"2026-09-01","first_observed_at":"2026-09-10","stage":"proposal","stage_actor":"Prosper Planning and Zoning Commission — public hearing 2026-09-01; Town Staff recommended approval","what_changed":null,"megawatts":null,"capacity_claims":[],"equipment_notes":null,"approvals_notes":"Requested: rezoning from Agricultural to a Planned Development for a Data Center on 37.3± acres (ZONE-26-0007) with a companion Future Land Use Plan amendment from Medium Density Residential and Retail and Neighborhood Services to Business Park; a draft Development Agreement (DEVAGRE-26-0011) is attached. Staff recommendation: approve. No decision by the commission or the council appears in any fetched document.","supplier_selection_notes":null,"inferred_buyer_relevance":null,"suggested_verification_next_step":"Read the P&Z minutes of 2026-09-01 (expected in the 2026-09-15 packet on the same hub) for the commission's vote, and the Town Council minutes of 2026-09-08 (expected 2026-09-22) for whether the item was withdrawn, tabled or heard; attach whichever exists as the outcome source before any decided stage is published.","review_state":"sample","unknowns":["IT load / critical capacity: no megawatt, kilovolt or square-footage figure for the facility appears in the agenda or the 104-page packet; only the tract (37.273 acres) and 20 percent lot coverage are stated","the commission's action on 2026-09-01: press reports a 7–0 recommendation of denial; not in any fetched document","the council's action on 2026-09-08: press reports the request was withdrawn before the meeting; the agenda only shows the hearing scheduled","applicant: no fetched document names the applicant party; press names White Rose Partners, which appears nowhere in the packet; owner of record D9-1 Assets, LLC per the deed cited in Exhibit A-1 and the Exhibit F-1 title block","county: the site is in Denton County per the deed and exhibit title block, while the municipality seed row lists Prosper under Collin"],"record_class":"project"}]}